
Concrete Driveway Building
Is your driveway cracking under parked trucks? We place four inches of crushed base and pour 4,000 PSI concrete over tied steel rebar.
Pomona Concrete Pro works a city with two halves: pre-war lots around Lincoln Park and Hacienda Park, where the paving has to suit the house and the commission that reviews it, and post-war and 1970s tracts running out to Phillips Ranch and Westmont. A garage floor at the end of an alley and a new frontage walk on Holt are both an ordinary week here.

Is your driveway cracking under parked trucks? We place four inches of crushed base and pour 4,000 PSI concrete over tied steel rebar.

Will Pomona clay soil break your patio slab? We pour four inches of concrete over four inches of compacted crushed rock with steel rebar.

Worried about stamped concrete flaking in summer heat? We pour 4 inch slabs using 4000 PSI integral mix over 4 inches of compacted rock.

Are lifting parkway roots cracking your walkway? We excavate, compact 4 inches of aggregate, and pour 4-inch sidewalk slabs in Pomona.

Is your garage slab settling under daily parking? We place four-inch structural pours with rebar grids and a four-inch crushed rock base.

Planning decorative flatwork in Pomona? We pour 4 inch stamped and stained slabs engineered for inland heat and alluvial ground stability.

Is your slope creeping toward the house? We pour reinforced stems with footings set 24 inches deep and continuous 4 inch schedule 40 pipe.

Worried about damp soil ruining your interior living floor? We pour 4 inches of 3500 PSI concrete over a continuous 15 mil vapor barrier.

Is your pool deck pulling away from the coping? We cast four-inch reinforced slabs over four inches of crushed base to stop ground shift.

Are your porch steps pulling away from the house? We pour rebar reinforced steps pinned into the stem wall with half inch steel dowels.

Building on Pomona clay? Slabs get 12-inch thickened perimeter footings, 4-inch compacted base stone, and 4000 PSI concrete reinforcement.

Worried about shifting subgrade in Pomona? We dig perimeter footings 18 inches into firm native ground and tie grade 60 steel rebar grids.

Need a commercial lot built for heavy truck traffic? We cast six-inch reinforced 4,000 PSI slabs over four inches of compacted rock base.

Will your home addition settle on shifting Pomona dirt? We dig footings 18 inches into firm bearing soil with tied steel reinforcement.

Has floor settlement cracked your drywall? We lift sinking perimeters with hydraulic jacks and drive steel piers 20 feet to load bedrock.

Need utility trenches or clean cuts without shattering older aggregate? We run diamond blades up to 8 inches deep with water containment.
Call the office or send the form, and someone rings back within 1 business day to set a time. Hector measures it, writes it and leaves the figure with you, none of which costs anything.